Our service offering is just as multifaceted as our customers’ wishes and requirements. Read through the reference list below to discover just what we do for customers, based on typical projects and jobs dating back through recent years. You will find a more detailed reference list under ‘Downloads’ at the bottom right of the page menu.
| Plant / Company / Country | Facility description | Scope of work carried out by I.C.E. AG | ||
| HVC Alkmaar (NL) | New waste-to-energy power plant (3 process units) |
Erection of the incineration system, commissioning, shift supervision and warranty care on behalf of the general contractor | ||
| ZAB Bazenheid (CH) | Expansion with a thermal processing plant for sewage sludge | Planning of the new sewage sludge plant: dimensioning, tendering, comparison of bids up to LOI | ||
| Waste-to-energy power plant (3 process units), units 1 + 2 |
Tendering, evaluation, award of contracts and supervision of retrofit work on the combustion chamber, electrostatic precipitator and 1st wet scrubbing stage Procedural and combustion checks |
|||
| Waste-to-energy power plant, plant expansion |
Engineering, fabrication and erection of flue gas ducts on behalf of the general contractor | |||
| KVA Horgen (CH) | Waste-to-energy power plant (2 process units), unit 2 |
General contractor for retrofit of furnace and combustion air systems | ||
| Waste-to-energy power plant (2 process units) |
Feasibility study and tendering for modifying the hot-water boiler into a steam boiler with new back-pressure turbine General contractor for delivery of a waste shredding plant |
|||
| Waste-to-energy power plant (2 process units), unit 1 |
General contractor for replacement of a brick-work combustion chamber with a boiler; modification of combustion air systems and optimization of combustion control | |||
| KVA Turgi (CH) | Waste-to-energy power plant (2 process units) |
Operation and maintenance consulting for the entire plant | ||
| Waste-to-energy power plant (2 process units), unit 3 |
Delivery of an injection system for site / process water into the combustion chamber General contractor for replacement of wet scrubber 1 including auxiliary systems Feasibility study, execution project and engineering for boiler retrofit and capacity increase |
|||
| Waste-to-energy power plant, expansion with a 4th process unit | Overall commissioning management, coordination of all lots, process engineering consulting, subproject management, care during the warranty phase on behalf of the plant owner | |||
| FUG Ulm (D) | Ulm district heating, cogeneration plant with coal and biomass boilers | Temporary deployment of a supervisor for operation and maintenance management Appraisal of dimensioning and operation of the biomass waste-to-energy unit Overall site management and project coordination for the biomass unit |
||
| MHKW Ulm (D) | Waste-to-energy power plant (2 process units), units 1 + 2 |
Incineration system refurbishment as part of annual plant overhaul Operational checks and optimizations |
||
| Waste-to-energy power plant (2 process units), units 1 + 2 |
Tendering for combustion chamber retrofits Delivery of a water injection system into the combustion chamber |
|||
| New waste-to-energy power plant (2 process units) |
Overall commissioning management, shift supervision for the entire plant, full process optimization on behalf of the general contractor Construction site and erection management, erection of incineration system, care during the warranty phase, revision of operating manuals on behalf of the general contractor |
|||
| CTD Vert-le-Grand (F) | New waste-to-energy power plant (2 process units) |
Combustion and boiler commissioning on behalf of the general contractor Expediting plant component deliveries on behalf of the general contractor |
||
| KEBAG Zuchwil (CH) | Waste-to-energy power plant (4 process units) |
Consulting / ongoing care for long-term overhaul and value retention planning | ||
| Waste-to-energy power plant (4 process units), units 1 – 3 |
Retrofits of flue gas cleaning: delivery, dismantling and erection of flue and clean gas ducts on behalf of the general contractor General contractor for waste feed system overhaul, replacement of vibrating conveyor with walking floor system rebuilding and optimization of secondary-air system Overall planning of retrofits for the combustion chamber, waste feed system, flue gas cleaning, and control systems (DCS) |
|||
| Waste-to-energy power plant (4 process units), units 1 – 4 |
Overhaul of incineration system, electrostatic precipitator, ash and clinker removal systems Erection of incineration system and bulky waste rotor shear on behalf of the general contractor |
|||
| KEZO Hinwil (CH) | Waste wrapping | Waste shredding and wrapping for interim storage | ||
| GfA Olching (D) & MHKW Ulm (D) | Waste wrapping | 5-year contract for waste shredding and wrapping for interim storage |